iPDS for Greenfield Project

IWBCS TECH LLP provided cost-saving solutions for a greenfield industrial project for an automobile parts manufacturer. Our efforts included:
- Identifying Design Inefficiencies: The initial structural design was overly heavy, and the space planning by the architect was not adequately aligned with operational needs.
- User Requirement Study: Conducted a detailed analysis of the client’s specific operational needs, workflows, and equipment requirements to better understand the project’s functional demands.
- Design Review: Thoroughly reviewed the architectural and structural designs to identify areas of inefficiency and opportunities for optimization.
- Optimized Plant Layout: Redesigned the plant layout to improve space planning, ensuring a more functional and efficient workspace aligned with production workflows.
- Structural Redesign: Simplified the structural design by reducing unnecessary elements, while still maintaining safety and functionality, resulting in material and cost savings.
- Capital Cost Savings: Our combined design adjustments resulted in a 25% reduction in the overall capital cost of the project, enhancing the project’s budget efficiency without compromising on quality or operational needs.
KEY ACHIEVEMENTS:
60 Lac saving in estimated project cost of 3.00 Cr with value engineering and rectification of design and delivera